Roofing invoice template
Roofing jobs are high value, so clear scope and materials matter. Show tear-off, underlayment, shingles and disposal clearly, along with warranty terms.
| Description | Qty | Unit | Price | Tax % | Amount |
|---|
How to create a roofing invoice in 3 steps
Add your details
Type your business name, contact details and license # at the top, then your client's name and address.
List the work
Edit the pre-filled lines: labor, parts and materials, with quantity and price. Sales tax, discount and deposit paid are calculated as you type.
Download the PDF
Click Download PDF and send it to your client. With a free account you can also save it and turn estimates into invoices later.
Typical roofing invoice line items
Example prices only; use your own rates.
| Item | Qty | Unit | Example price |
|---|---|---|---|
| Tear-off of existing shingles | 25 | sq | $90.00 |
| Synthetic underlayment | 25 | sq | $35.00 |
| Architectural shingles installed | 25 | sq | $285.00 |
| Ridge vent and flashing | 1 | lot | $650.00 |
| Debris removal | 1 | ea | $400.00 |
What to include on a roofing invoice
- Your business name, address, phone and email
- Your license or tax number, if your state or country requires it
- The client's name and service address
- A unique invoice number, the invoice date and the due date
- Each line of work: description, quantity, unit and price
- Subtotal, sales tax or VAT, discounts and the total
- Any deposit already paid and the balance due
- Payment terms and how the client can pay you
Rules differ by place. See invoice requirements by country for the US, UK, Canada and Australia.
Tips for roofer invoices
- Use roofing squares (100 sq ft) for quantities; it is the industry standard.
- State exactly what is replaced, such as decking or flashing.
- Spell out the payment schedule in the terms.
- Add a validity period; material prices move quickly.
Frequently asked questions
What should a roofing estimate include?
Roof size, material brand and color, scope of tear-off, underlayment, flashing, ventilation, disposal, warranty and payment schedule.
What if decking needs repair?
Add a line for decking repair priced per sheet, and state that it is billed only if damage is found.
How long should an estimate be valid?
Thirty days is typical. Material prices can change, so state it on the document.
Prices are examples only. This template is not legal or tax advice.